Garden Universe
Wheelie Bin Storage Unit Triple Three Bins Garden Universe Outdoor 3 Wheelie Bin Storage In Grey WBS02-GREY
Couldn't load pickup availability
Buy on Amazon
As an Amazon Associate we earn from qualifying purchases.
Brand: Garden Universe
Color: Grey
Features:
- Tripple Wheelie Bin Store for three standard 240L wheelie bins. Size: W 204.5cm x D 87cm x H 122cm (Imperial W 6' 8.5'' x D 2' 10'' x H 4')
- Points of Note: Our wheelie bin storage unit has a proper back panel most others are flimsy with only side panels and front doors and require you to attach them to a wall or fence for stability. You can sit our wheelie bin store anywhere and it will hide those unsightly bins from all sides.
- Fittings: Galvanised hinges and door latches.
- Material: Treated Fir Wood.
- Other Uses: Log Store, Garden Equipment Store, Garden Furniture Store, etc.
- This item will be sent in 2 large cartons on a 24H Service and is supplied flatpack, it takes roughly 50 minutes to assemble.
model number: WBS03-GREY
Part Number: WBS02-GREY
Details: Product description
Garden Universe is delighted to launch its new range of Wheelie Bin Storage Units. Our first unit is finished in the most popular colour, Grey, and accommodates three standard 240L wheelie bins. Unlike many competitors, our units feature a fully enclosed design, with proper backs that conceal bins from all five sides. This not only enhances the aesthetic appeal but also ensures the unit is sturdy and self-supporting, eliminating the need to fix it to a wall or fence.
Safety Warning
Always assemble this product with at least two people. Be cautious when handling heavy wheelie bins. Always follow the assembly instructions provided.
EAN: 5060298406033
Package Dimensions: 50.4 x 34.3 x 7.5 inches
Share
